Baker & O'Brien, Inc.

Experience

Experience

 

Case Attribute: Gas to Liquids

Article
Fischer Tropsch (FT) Liquids Market Study
Evaluated potential markets for Fischer Tropsch products, and the logistical requirements to access those markets from a coal-to-liquids facility.  The products included LPG, naphtha, jet fuel, and diesel, and the analysis included expected netback pricing (FOB the plant) to support financial modeling of the capital project.
Gas to Liquids , Physical Asset Appraisal , Pricing , Project Feasibility
Gas to Liquids Evaluation
On behalf of a major oil and gas producer, prepared a conceptual design for a Fischer-Tropsch based gas-to-liquids unit using low value associated gas to produce LPG, gasoline, and zero sulfur diesel.  Developed estimates of charge and yield, capital and operating costs, and project development and capital spending schedules.
Gas to Liquids , Pricing , Project Feasibility
Global Gasification Feedstock Analysis
Conducted an analysis of the potential low-cost carbon feedstocks for a grassroots gasification project to produce a combination of synthetic fuels and electricity.  The study investigated sources and delivered costs for various feedstocks, including coal, petroleum coke, and low-valued refinery streams such as residuum and cracked fuel oils.  Historical data was used to assess pricing mechanisms for world petroleum coke prices, including delivered coal prices to Japan and Western Europe.
Gas to Liquids , LNG , Pricing , Project Feasibility
Technology Commercialization
Performed due diligence on a new gas-to-liquids (GTL) process to evaluate possible routes to commercialization.  The work program included the following steps: verification of mass balance, comparison of laboratory and pilot plant yields, evaluation of alternative technologies, assessment of scale-up issues, review of preliminary commercial design, estimate of capital costs, and the development of an economic model that included sensitivity analyses for capital costs, yields, and prices.
Gas to Liquids , Intellectual Property , Project Feasibility
Feasibility Assessment
Developed a feasibility study for a large, potentially stranded, natural gas discovery. Constructed an economic model to evaluate potential options for gas monetization, including pipeline natural gas sales, gas-to-liquids (GTL), and liquefaction (LNG). Performed market assessments for the LNG and GTL products.
Gas to Liquids , LNG , Pricing , Project Feasibility
CTL/GTL Question-Answer Session
Presented background information to groups of stock research analysts in New York and Boston on the technologies utilized in gas-to-liquids and coal-to-liquids processes.  In addition, the economics of gasification projects in the U.S. and the role of publicly traded companies in GTL and CTL was discussed.
Gas to Liquids , Gasification
GTL Technology and Cost Evaluation
Evaluated the technology, cost estimate and financial model for a small scale GTL project to convert natural gas to liquid specialty products. The project evaluation included a review of the synthesis gas process, Fischer-Tropsch (FT) reactor technology, product recovery and product separation. The project definition and stage of development were evaluated for technology risk, cost estimate range of accuracy and suitability of the financial model assumptions.
Gas to Liquids
GTL Screening Model
Developed a gas-to-liquids project screening model for potential North American sites.
Gas to Liquids , Project Feasibility
Lender's Engineer - GTL Plant
Served as Independent Engineer on behalf of a major Australian bank for the construction of a GTL plant.  Prepared a technology assessment, analyzed feedstock supply, and reviewed contracts.  Inspected equipment and confirmed permits were in place prior to authorizing draw-down certificates.  Monitored construction progress, confirmed expenditures, and compared these expenditures against budget.
Commercial Terms Review , Environmental , EPC-related , Gas to Liquids , Operations/Maintenance
GTL Facility Due Diligence
Performed due diligence for a company evaluating an equity investment in a GTL facility under construction.  Reviewed project budget and schedule for completion. Evaluated the amount of contingency included in the budget, confirmed the status of payments to contractors and other service providers; interviewed project representatives regarding mechanical completion and commissioning plans.
Environmental , EPC-related , Gas to Liquids , Operations/Maintenance